History

María Iglesias Marín edited WP2 "Physical principles".

29.03.2021

María Iglesias Marín edited WP2 "Physical principles".

29.03.2021

Beatriz Domínguez opened work package 6: Operation.

22.03.2021

Beatriz Domínguez opened work package 5: Operation.

22.03.2021

Beatriz Domínguez opened work package 4: Implementation.

22.03.2021

Beatriz Domínguez opened work package 3: Design and prototyping.

22.03.2021

Beatriz Domínguez edited device structured information.

22.03.2021

Beatriz Domínguez edited device structured information.

22.03.2021

Beatriz Domínguez edited device structured information.

22.03.2021

Andres Diaz Lantada accepted work package 1 by review.

20.03.2021